Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Mr-Glass Home Additions & ADU: The Santa Clarita Owner’s Guide
We build and install Mr-Glass home additions and ADU packages in Santa Clarita, and a typical fully installed project runs $45,000 – $130,000 depending on size, foundation work, and finish level. Additions and ADUs aren’t a same-day swap – most Santa Clarita projects take weeks, not hours, and we quote them in writing before anything moves. Owners usually land on a page like this after a few telltale failures: a sliding door that won’t track, a sunroom glass panel that fogs, a threshold that lets in water during a Santa Clarita rain. If that’s you, you’re in the right place.

Which Mr-Glass Models This Applies To
Mr-Glass made a range of addition and ADU components – sliding glass doors, sunroom and patio-enclosure panels, thresholds, tracks, and glazing panels – and the same part number doesn’t fit every series. Before we order anything, we pull the model and serial sticker, usually on the door jamb or the frame edge of a panel. Some older Mr-Glass components share a track profile with newer units, but the glass thickness and seal differ, so a “close enough” replacement will fog or leak within a season or two.
On the OEM-versus-aftermarket call, it’s not always obvious. For a lot of Mr-Glass door and panel hardware, an OEM part is the safest match. For glazing, seals, and thresholds, a quality aftermarket equivalent that meets the same spec will hold up just as well and often costs less. We won’t push OEM if it isn’t necessary, and we won’t swap in a cheap lookalike just to save a buck – we’ll tell you which one actually matches and why.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Mr-Glass Home Additions & ADU Is Failing
Here’s what usually goes first, and what’s really behind it:
- The door drags or won’t track smoothly. Rollers wear, or the track has filled with grit and Santa Clarita dust. Once a roller goes, the door sags and starts damaging the track – catch it early.
- Glass panels fog between the panes. The seal has failed and moisture is inside the unit. It won’t clear, and in our sun and heat swings it usually spreads.
- Water at the threshold after rain. Failed thresholds, worn sweeps, or seals that have dried out. Left alone, that water works its way into the framing.
- Drafts or rattling in the wind. Worn weatherstripping or a door that’s out of square. Often a hardware fix, but worth checking before it becomes a bigger one.
- Sticking, sagging, or hard-to-latch doors. Settling or a failing hinge/track combo. That seal gap lets water and air in.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
For Santa Clarita, an installed home addition or ADU project runs $45,000 – $130,000. Garage conversions sit around $30,000 – $80,000, and ADU construction runs $90,000 – $220,000 depending on site work. What moves the range: size and footprint, foundation and grading, roof tie-in, glass and door spec, and finish level.
We give you a written line-item quote – parts and labor broken out, no mystery bundle. If scope changes mid-job, you get a written change order before the work proceeds. Every eligible job includes permits pulled and inspections signed, and the work is backed by our written 90-Day Done Right Promise.
DIY or Call Us?
You can safely check a few things yourself: whether the door tracks and latches cleanly, whether the frame is square, and whether the threshold shows water staining. What you shouldn’t do yourself is structural work – foundation, framing, roof tie-in, or anything electrical. Those are where DIY goes wrong and where permits and inspections actually protect you.
If you’re weighing the job, call us at (833) 762-8116 and we’ll talk through what you’re seeing and what it needs. A live person answers, and the estimate is free. We’re an independent Santa Clarita builder, not affiliated with Mr-Glass.
FAQs
How long does a Mr-Glass addition or ADU component last?
Most Mr-Glass door and panel hardware holds up 15 – 25 years with normal care; glass seals often fail sooner in our heat swings. If yours is older and fogging or dragging, it’s worth a look.
Can the part be repaired instead of replaced?
Sometimes – worn rollers, weatherstripping, and sweeps are usually repairable. Fogged glass units and failed thresholds generally mean replacement. We’ll tell you which one you’re dealing with.
How long does the swap take?
It depends on the scope. A hardware or panel swap is often a short visit; a full addition or ADU is a multi-week project with permits. We’ll give you a written timeline up front.
How do you source the part?
We match your Mr-Glass model and serial from the label, then confirm the spec – OEM or a quality aftermarket equivalent – before ordering. No guessing on the track profile.
Call (833) 762-8116 to schedule your free estimate in Santa Clarita.
Written by the team at Barrett & Sons Construction Santa Clarita, serving Santa Clarita and nearby areas.